RPSSGP

Rooftop PV & Small Solar Power Generation Programme (RPSSGP)
In order to give a thrust to rooftop PV and other small solar power plants connected at distribution network at voltage levels below 33 kV envisaged under Phase I of the Jawaharlal Nehru National Solar Mission (JNNSM), the Ministry of New and Renewable Energy (MNRE) has launched a programme on generation based incentives.
The key features of the programme are as under.

Explanation: Project schemes from States wherein Tariff tenure for duration of 25 years with Tariff structure on levelised basis has been determined by SERCs shall alone be considered to be eligible to participate in this Programme (RPSSGP).

Explanation: Base Rate of Rs 5.50 per unit to be considered for the purpose of computation of GBI, shall remain constant over duration of 25 years. Thus, GBI determined for a project (which is the difference of CERC determined tariff and Base Rate) shall remain constant for entire duration of 25 years. Base Rate for projects to be commissioned during each subsequent year shall also be modified at escalation factor of 3% p.a. and such escalated Base Rate shall remain constant over duration of 25 years.
GBI shall be payable to the distribution utility for period of 25 years from the date of commissioning of the project.
IREDA has been designated as ‘Programme Administrator’ by the Ministry of New and Renewable Energy for administering the generation based incentive programme for rooftop PV and other small solar power plants.

MNRE policy on RPSSGP

Download Pdf

Net exported power from the projects commissioned under RPSSGP for the month of December, 2012

Download Pdf

Net exported power for the month of March 2013

Download Pdf

Net Exported Power for the month of April 2013

Download Pdf

Net Exported Power for the month of May 2013

Download Pdf

Net Exported Power for the month of June 2013

Download Pdf

Net Exported Power for the month of July 2013

Download Pdf

Net Exported Power for the month of September 2013

Download Pdf

Net Exported Power for the month of October 2013

Download Pdf

Net Exported Power for the month of November 2013

Download Pdf

Net Exported Power for the month of December 2013

Download Pdf

Net Exported Power for the month of January 2014

Download Pdf

Net Exported Power for the month of March 2014

Download Pdf

Net Exported Power for the month of April 2014

Download Pdf

Net Exported Power for the month of May 2014

Download Pdf